|
|
|
|
Repairs & Modifications |
|
Repairs |
|
Tanks and Systems can be of service in any form of repair work, should it be a leaking vessel, damages
or cracked pipework or a fitting causing a problem. Any time consuming faults that may arise in your
production line, we can repair/modify on site, or should the problem be on a larger scale then we could
return it back to our works. The item(s) would then be changed/modified, repaired and re-tested before
being distributed back to its designated place.
|
|
|
Modifications |
|
Should you require a modification on an existing vessel for e.g. Extra fittings, added support or even a
bund to be fabricated, Tanks & Systems will calculate the specific variable dimensions available and the
compatibilities to suit your tank, fabricate and install the item(s) to meet your requirements.
|
|
|
 |
Mild Steel Tank With HDPE Bund (Tank on the right) |
|
 |
Polypropylene Pipe Work Installed On A Skid Mounted Filter System |
|
 |
HDPE Cylindrical Tank And Pipe Work With Triple Pump Supply |
|
 |
HDPE Cylindrical Tank And Pipe Work With Triple Pump Supply |
|
 |
'10' Valved Manifold Dosing Skid |
|
All types of thermoplastic vessels upto 60 cubic metres capacity with various configurations
can be accommodated. We can install pumps, pipework and steelwork at your request, including
free issue items.
|
|
|
|
|
|